MAJOR WORKS
impacts, issues, business
for the draft of Florence
AV crossing would cost ten times as much as possible?
impacts, issues, business
for the draft of Florence
AV crossing would cost ten times as much as possible?
A Trip in the infrastructure sector to understand the changes in Italian politics and the economy of the last 15 years.
the "great works" between environmental destruction and exploitation of public resources, an opportunity for restructuring social problem of transparency and democracy.
Italian company manufacturing by producing a devourer of territory, the entrance of the mafias in major public contracts.
The absence of a serious program of public works as a precondition for the division of resources.
Speakers: Alberto
Ziparo planner
Stefano Lenzi responsible for the legislative WWF
Ivan Cicconi experienced public works and infrastructure
Ivan Cicconi experienced public works and infrastructure
will follow discussions with representatives of political movements and Italian environmentalists.
January 19, 2011
15.00
Palazzo Vecchio
Hall of Miniatures
15.00
Palazzo Vecchio
Hall of Miniatures
Technical Study Group under crossing AV Florence
Committee against the underpass AV Florence
Committee against the underpass AV Florence
With the collaboration of the groups board
Perunaltracittà
Left and Freedom Group to Spini Firenze
0 comments:
Post a Comment